Footscray Hospital, Footscray

Another quality project by AAH Contracting

Location

Footscray, Victoria

Completion

Various Dates

Safety

Highest Safety Standards

Download

Download The Case Study

Project Overview

The Footscray Hospital, in Footscray, Victoria, was first opened in 1938. AAH has been engaged on numerous occasions to assist with refurbishments of the hospital.

  • Removal of damaged duct work
  • Removal of damaged heater exchange
  • Removal of debris
  • Removal of asbestos cement sheets
  • Removal of cabinetry and internal wall linings
  • Removal of asbestos contaminated debris in duct work
  • Supervise sheeting of canopies
  • Drilling through bituminous membrane
  • Removal of asbestos contaminated pipe work
  • Transport & disposal of all waste to EPA licensed facilities