Project Overview
- Location
- Bundoora, Victoria
- Completed
- February 2026 (approx.)
- Industry
- Education
Services Delivered
Hazardous MaterialsSilica Dust
AAH carried out a full silica dust clean of Building 253, level 1, at RMIT's Bundoora campus, reaching practically all surfaces high and low throughout the designated area following the scope confirmed on site.
The client was overall happy with the standard of cleanliness achieved, with the biggest achievement being the time savings delivered against the program, demonstrating AAH's capability in full-surface silica dust decontamination within an operational education facility.
Scope of Works
- Full removal of silica dust from ceiling to floor level, covering high and low surfaces throughout
- Excludes palleted items and machine shields