Project Overview
- Location
- Bulleen, Victoria
- Completed
- Ongoing
- Industry
- Road & Rail
Services Delivered
AAH set up asbestos removal areas with drop sheets, barrier tape and signage for each contractor's work front at the Bulleen Road site. For Symal Infrastructure, AAH carried out direct removal of asbestos within soil. For Pitchcraft, AAH supervised trenching works alongside the plumbing crew's marked-out trenches, providing a spotter outside the barrier to direct excavation safely through asbestos-contaminated ground, including supplying P2 face masks to other trades' personnel and electricians entering the asbestos zone. For Zinlow Group, AAH supervised works in conjunction with asbestos-in-soil conditions across the site.
AAH has maintained concurrent asbestos oversight across three separate civil trade packages at the same North East Link site since February 2026, protecting other trades' personnel entering asbestos-affected zones with supplied PPE, demonstrating AAH's ability to provide asbestos management support across multiple contractors working the same live infrastructure site.
Scope of Works
- Asbestos removal within soil for Symal Infrastructure
- Supervision of trenching works for Pitchcraft
- Supervision of Zinlow Group's works amid asbestos-in-soil conditions
- Delivered under site-specific SWMS & control plan with drop sheet & barrier containment