Ford Casting Plant Geelong
Another quality project by AAH Contracting
Location
Geelong, Victoria
Completion
April 2019
Safety
Highest Safety Standards
Download
Download The Case Study
Project Overview
After asbestos cement sheet was found in areas within the site, AAH Contracting was commissioned to undertake asbestos soil remediation.
AAH was tasked with the following:
- The removal of 4000m2 of super six roofing
- Removal of all internal asbestos to 6x redundant buildings
- In stage 2 of the demolition works to remove all of the remaining asbestos throughout the site
Critical Factors/Challenges
The challenges and critical factors to successfully complete the works were:
- With removalists spread throughout the plant site it was important that AAH’s dedicated manager had to stay in constant with all
- Detailed planning and methodologies were thought out and applied to each task and workshopped prior to commencement.
Outcomes
- All removal works were completed to the highest safety standard with a unique yet methodical approach taken to remove a structurally unsound roof
- We had a Project Manager dedicated full time to this 4 month project