Project Overview
- Location
- HMAS Cerberus, Victoria
- Completed
- 2021
- Industry
- Defence
Services Delivered
As part of the HMAS Cerberus Defence Upgrade, AAH Contracting delivered staged remediation works across multiple buildings for CCG and Delta Group under Lendlease. A non-toxic stripping agent and light abrasive blasting were used to expose original heritage brickwork, with protective measures in place to safeguard adjacent finishes. Works also included targeted asbestos removal prior to restoration.
The project was delivered with precision, achieving full environmental and safety compliance while carefully restoring the brick façades to their original condition. AAH's focus on heritage sensitivity, surface protection, and controlled sequencing ensured a high-quality result with zero safety incidents and strong client satisfaction.
Scope of Works
- Staged remediation across multiple heritage-listed buildings (HMAS Cerberus Defence Upgrade)
- Lead-based paint removal via non-toxic stripping agent
- Light abrasive blasting to expose original heritage brickwork
- Targeted asbestos removal prior to restoration