Project Overview
- Location
- Southbank, Victoria
- Completed
- September 2025
- Industry
- Commercial
Services Delivered
Working an after-hours night shift from 10pm, AAH set up a self-contained wet abrasive blasting rig and connected it to a water supply to gently blast rust and calcium contamination from the bluestone pavers, with Harris HMC providing traffic management, a spotter and public protection given the site's position alongside St Kilda Road. AAH swept and shovelled the bulk waste, washed down the area, and handed the site back for client inspection before packing up.
AAH restored the bluestone paving to Harris HMC's satisfaction within a single night shift, working safely alongside live pedestrian and traffic conditions on one of Melbourne's busiest boulevards, demonstrating AAH's capability in surface restoration work using wet abrasive blasting techniques outside its core asbestos and hazardous materials services.
Scope of Works
- Wet abrasive blasting of bluestone pavers to remove rust & calcium deposits left beneath removed planter boxes
- Delivered as an after-hours night shift with a self-contained wet blasting trailer rig